Roxbury Community College’s physical campus is closed for the holidays and scheduled maintenance from Monday, 12/22/2025 – Sunday, 1/4/2026. Normal business hours resume on Monday, 1/5/2025. Students enrolled in winter session classes should visit their courses in Canvas for information and support instructions. The Reggie Lewis Track and Athletic Center is closed from Tuesday, 12/23/22025 – Saturday, 12/27/2025, on Monday, 12/29/2025, and on Thursday, 1/1/2026. The Center is otherwise open for high school track and previously scheduled activities. Please visit the Reggie Lewis Center’s website calendar for a complete listing of scheduled activities.
APPLYMyRCC
RCC Campus

Visit RCC

Visit RCC

In 2017, a $72.5 million campus renovation project resulted in a state-of-the-art campus designed to provide students with a superior learning environment.   

The Media Arts Center (Building 1) now features a beautiful auditorium, complete with new seats, curtains, lights, BOSE sound system, and a fully-accessible stage.  The Academic Building (Building 3) now includes a Student Commons, cafeteria, renovated Library & Learning Center, and industry-quality STEM labs.  The former Student Center was transformed into the Health Sciences Building (Building 4), which includes a mock hospital, nursing simulation lab, radiologic technology (x-ray) lab, and CVS Mock Pharmacy. Recent upgrades to the Administration Building (Building 2) ensure students receive support services in a new, visually-appealing environment.  The Reggie Lewis Center is also an integral part of RCC’s campus, providing visitors from across the state with access to a world-renowned track and field house, basketball courts, and space for community programming. 

Visit directions and parking page for information on visiting the campus in person. Hoping to get a feel for the campus without leaving home?  Take a virtual tour for an immersive look at RCC’s facilities.  

Visit RCC
Apply Inquire
Open widget